De Beer, Morris2009-01-302009-01-302001-11De Beer, M. 2001. Feedback on the Inaugural Meeting of the Cost 347 Accelerated Loading Test (ALT) Action in Europe: June 27th to 29th 2001. Technical Report, TR-2001/33, pp 31http://hdl.handle.net/10204/2944Describes in summary the attendance of the author at an invited meeting of the COST 347 ALT (Accelerated Loading Testing) Committee in Cologne, Germany, Europe. The meeting was held at Bast, near Cologne, from 27th June 2001 to 29th June 2001. The author presented two topics, i.e. Accelerated Pavement Testing (APT) in South Africa, and Stress-In-Motion (SIM). This COST 347 action started in October 2001, and needs to deliver recommendations on ALT April 2004. There are 6 Working Groups, chaired by several country members, working on the project.enAccelerated pavement testingAPTAccelerated loading testingEuropeFeedback on the Inaugural Meeting of the Cost 347 Accelerated Loading Test (ALT) Action in Europe: June 27th to 29th 2001ReportDe Beer, M. (2001). <i>Feedback on the Inaugural Meeting of the Cost 347 Accelerated Loading Test (ALT) Action in Europe: June 27th to 29th 2001</i> CSIR. Retrieved from http://hdl.handle.net/10204/2944De Beer, Morris <i>Feedback on the Inaugural Meeting of the Cost 347 Accelerated Loading Test (ALT) Action in Europe: June 27th to 29th 2001.</i> CSIR, 2001. http://hdl.handle.net/10204/2944De Beer M. Feedback on the Inaugural Meeting of the Cost 347 Accelerated Loading Test (ALT) Action in Europe: June 27th to 29th 2001. 2001 [cited yyyy month dd]. Available from: http://hdl.handle.net/10204/2944TY - Report AU - De Beer, Morris AB - Describes in summary the attendance of the author at an invited meeting of the COST 347 ALT (Accelerated Loading Testing) Committee in Cologne, Germany, Europe. The meeting was held at Bast, near Cologne, from 27th June 2001 to 29th June 2001. The author presented two topics, i.e. Accelerated Pavement Testing (APT) in South Africa, and Stress-In-Motion (SIM). This COST 347 action started in October 2001, and needs to deliver recommendations on ALT April 2004. There are 6 Working Groups, chaired by several country members, working on the project. DA - 2001-11 DB - ResearchSpace DP - CSIR KW - Accelerated pavement testing KW - APT KW - Accelerated loading testing KW - Europe LK - https://researchspace.csir.co.za PY - 2001 T1 - Feedback on the Inaugural Meeting of the Cost 347 Accelerated Loading Test (ALT) Action in Europe: June 27th to 29th 2001 TI - Feedback on the Inaugural Meeting of the Cost 347 Accelerated Loading Test (ALT) Action in Europe: June 27th to 29th 2001 UR - http://hdl.handle.net/10204/2944 ER -