ResearchSpace

Rehabilitation of Yzerfontein breakwater by Dolos armour units

Show simple item record

dc.contributor.author Letsie, Masupha M
dc.contributor.author Tulsi, Kishan R
dc.contributor.author Phelp, David T
dc.contributor.author Johnson, Craig M
dc.date.accessioned 2018-01-04T10:45:24Z
dc.date.available 2018-01-04T10:45:24Z
dc.date.issued 2015-07
dc.identifier.citation Letsie, M.M. et al. 2009. Rehabilitation of Yzerfontein breakwater by Dolos armour units. Coasts, marine structures and breakwaters: Adapting to change, Edinburgh, U.K, 16-17 September 2009 en_US
dc.identifier.uri https://doi.org/10.1680/cmsb.41318.0059
dc.identifier.uri http://www.icevirtuallibrary.com/doi/abs/10.1680/cmsb.41318.0059
dc.identifier.uri http://hdl.handle.net/10204/9921
dc.description Paper delivered at Coasts, marine structures and breakwaters: Adapting to change, Edinburgh, U.K, 16-17 September 2009. Due to copyright restrictions, the attached PDF file only contains the abstract of the full text item. For access to the full text item, please consult the publisher's website. en_US
dc.description.abstract The Yzerfontein breakwater was constructed in 1950 and has since been subjected to extensive deterioration. In order to extend the lifespan of the breakwater a maintenance program was to be carried out. Various options are described in the maintenance reports by Entech Consultants of which one option was to reshape the existing structure and place a layer of concrete armour for the repair of the deteriorated breakwater. The physical model focused on this model. It was prposed that a layer of 20 ton Dolos be placed to protect the breakwater from further excessive damage. In cicrumstances such as this, physical model tests are needed to evaluate the maintenance options available and to improve structural stability by testing the armour stability against wave attack. This report gives details of the physical model study for the rehabilitation of the Yzerfontein breakwater. Entech Consultants provided the design information proposed for the repair of the breakwater. en_US
dc.language.iso en en_US
dc.publisher ICE Publishing en_US
dc.relation.ispartofseries Worklist;19885
dc.subject Breakwater en_US
dc.subject Rehabilitation en_US
dc.subject Yzerfontein en_US
dc.title Rehabilitation of Yzerfontein breakwater by Dolos armour units en_US
dc.type Conference Presentation en_US
dc.identifier.apacitation Letsie, M. M., Tulsi, K. R., Phelp, D. T., & Johnson, C. M. (2015). Rehabilitation of Yzerfontein breakwater by Dolos armour units. ICE Publishing. http://hdl.handle.net/10204/9921 en_ZA
dc.identifier.chicagocitation Letsie, Masupha M, Kishan R Tulsi, David T Phelp, and Craig M Johnson. "Rehabilitation of Yzerfontein breakwater by Dolos armour units." (2015): http://hdl.handle.net/10204/9921 en_ZA
dc.identifier.vancouvercitation Letsie MM, Tulsi KR, Phelp DT, Johnson CM, Rehabilitation of Yzerfontein breakwater by Dolos armour units; ICE Publishing; 2015. http://hdl.handle.net/10204/9921 . en_ZA
dc.identifier.ris TY - Conference Presentation AU - Letsie, Masupha M AU - Tulsi, Kishan R AU - Phelp, David T AU - Johnson, Craig M AB - The Yzerfontein breakwater was constructed in 1950 and has since been subjected to extensive deterioration. In order to extend the lifespan of the breakwater a maintenance program was to be carried out. Various options are described in the maintenance reports by Entech Consultants of which one option was to reshape the existing structure and place a layer of concrete armour for the repair of the deteriorated breakwater. The physical model focused on this model. It was prposed that a layer of 20 ton Dolos be placed to protect the breakwater from further excessive damage. In cicrumstances such as this, physical model tests are needed to evaluate the maintenance options available and to improve structural stability by testing the armour stability against wave attack. This report gives details of the physical model study for the rehabilitation of the Yzerfontein breakwater. Entech Consultants provided the design information proposed for the repair of the breakwater. DA - 2015-07 DB - ResearchSpace DP - CSIR KW - Breakwater KW - Rehabilitation KW - Yzerfontein LK - https://researchspace.csir.co.za PY - 2015 T1 - Rehabilitation of Yzerfontein breakwater by Dolos armour units TI - Rehabilitation of Yzerfontein breakwater by Dolos armour units UR - http://hdl.handle.net/10204/9921 ER - en_ZA


Files in this item

This item appears in the following Collection(s)

Show simple item record