Title: Addressing the technical capacity constraints on community-based labour intensive road projects - a case study of the Amadiba road project
Authors: Lachman, A
Thevadasan, S
Keywords: Road construction
Capacity constraints
Community development
Bizana municipality
On-the-job training
Issue Date: Sep-2006
Citation: Lachman, A and Thevadasan, S. 2006. Addressing the technical capacity constraints on community-based labour intensive road projects - a case study of the Amadiba road project. 3rd IRF/SARF Regional Conference for Africa and Exhibition: Roads for the African Renaissance, Durban, South Africa, 11-13 September 2006
Abstract: Amadiba Road is a 44km-long gravel road, which runs from the R61 between Port Edward and Bizana, down to the sea. It was a community-based, labour-intensive project managed by CSIR Built Environment, with funding from the national Poverty Alleviation Fund, through the South African National Roads Agency Limited. The project began in January 2002 and was completed in September 2003. All the work was done by unskilled or semi-skilled community members, including the building of low-level bridges. Construction management was entrusted to selected local community members who with training have developed to the stage where they can become competent contractors. The project was overseen by a steering committee set up to include mainly members of the local community. The technical training was commissioned during various stages of the project and allowed the trainees to receive hands-on experience during the construction process. This was aimed at enhancing their ability to manage the maintenance of the road, and to undertake projects other than roads. Haulage of gravel was entrusted entirely onto local providers of tractor/trailers or trucks. The income enabled them to upgrade their equipment and to look for more work of similar nature. Three years on, this paper investigates the skills transfer and capacity building initiatives of the project and will report on the current state of the community.
URI: http://hdl.handle.net/10204/827
Appears in Collections:Infrastructure engineering
General science, engineering & technology

Files in This Item:

File Description SizeFormat
Lachman_2006_D.pdf3.07 MBAdobe PDFView/Open
View Statistics

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback