ResearchSpace

Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019)

Show simple item record

dc.contributor.author Wright, Jarrad G
dc.contributor.author Calitz, Joanne R
dc.date.accessioned 2019-06-28T12:58:57Z
dc.date.available 2019-06-28T12:58:57Z
dc.date.issued 2019-04
dc.identifier.citation Wright J.G. and Calitz, J.R. 2019. Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019). en_US
dc.identifier.uri http://hdl.handle.net/10204/11017
dc.description Copyright: 2019 CSIR en_US
dc.description.abstract The RSA power system became constrained again in the first quarter of 2019, with Eskom needing to loadshed to stage 4 at times. Causes of loadshedding have been cited as high unplanned plant failures on the thermal coal fleet, the loss of the Cahora Bassa import from Mozambique followed by intensive use of diesel (at OCGTs) and water (at pumped storage schemes) which eventually depleted. en_US
dc.language.iso en en_US
dc.publisher CSIR en_US
dc.subject Loadshedding en_US
dc.subject Variable energy contributions en_US
dc.subject South African power systems en_US
dc.title Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019) en_US
dc.type Conference Presentation en_US
dc.identifier.apacitation Wright, J. G., & Calitz, J. R. (2019). Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019). CSIR. http://hdl.handle.net/10204/11017 en_ZA
dc.identifier.chicagocitation Wright, Jarrad G, and Joanne R Calitz. "Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019)." (2019): http://hdl.handle.net/10204/11017 en_ZA
dc.identifier.vancouvercitation Wright JG, Calitz JR, Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019); CSIR; 2019. http://hdl.handle.net/10204/11017 . en_ZA
dc.identifier.ris TY - Conference Presentation AU - Wright, Jarrad G AU - Calitz, Joanne R AB - The RSA power system became constrained again in the first quarter of 2019, with Eskom needing to loadshed to stage 4 at times. Causes of loadshedding have been cited as high unplanned plant failures on the thermal coal fleet, the loss of the Cahora Bassa import from Mozambique followed by intensive use of diesel (at OCGTs) and water (at pumped storage schemes) which eventually depleted. DA - 2019-04 DB - ResearchSpace DP - CSIR KW - Loadshedding KW - Variable energy contributions KW - South African power systems LK - https://researchspace.csir.co.za PY - 2019 T1 - Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019) TI - Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019) UR - http://hdl.handle.net/10204/11017 ER - en_ZA


Files in this item

This item appears in the following Collection(s)

Show simple item record