dc.contributor.author |
Wright, Jarrad G
|
|
dc.contributor.author |
Calitz, Joanne R
|
|
dc.date.accessioned |
2019-06-28T12:58:57Z |
|
dc.date.available |
2019-06-28T12:58:57Z |
|
dc.date.issued |
2019-04 |
|
dc.identifier.citation |
Wright J.G. and Calitz, J.R. 2019. Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019). |
en_US |
dc.identifier.uri |
http://hdl.handle.net/10204/11017
|
|
dc.description |
Copyright: 2019 CSIR |
en_US |
dc.description.abstract |
The RSA power system became constrained again in the first quarter of 2019, with Eskom needing to loadshed to stage 4 at times. Causes of loadshedding have been cited as high unplanned plant failures on the thermal coal fleet, the loss of the Cahora Bassa import from Mozambique followed by intensive use of diesel (at OCGTs) and water (at pumped storage schemes) which eventually depleted. |
en_US |
dc.language.iso |
en |
en_US |
dc.publisher |
CSIR |
en_US |
dc.subject |
Loadshedding |
en_US |
dc.subject |
Variable energy contributions |
en_US |
dc.subject |
South African power systems |
en_US |
dc.title |
Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019) |
en_US |
dc.type |
Conference Presentation |
en_US |
dc.identifier.apacitation |
Wright, J. G., & Calitz, J. R. (2019). Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019). CSIR. http://hdl.handle.net/10204/11017 |
en_ZA |
dc.identifier.chicagocitation |
Wright, Jarrad G, and Joanne R Calitz. "Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019)." (2019): http://hdl.handle.net/10204/11017 |
en_ZA |
dc.identifier.vancouvercitation |
Wright JG, Calitz JR, Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019); CSIR; 2019. http://hdl.handle.net/10204/11017 . |
en_ZA |
dc.identifier.ris |
TY - Conference Presentation
AU - Wright, Jarrad G
AU - Calitz, Joanne R
AB - The RSA power system became constrained again in the first quarter of 2019, with Eskom needing to loadshed to stage 4 at times. Causes of loadshedding have been cited as high unplanned plant failures on the thermal coal fleet, the loss of the Cahora Bassa import from Mozambique followed by intensive use of diesel (at OCGTs) and water (at pumped storage schemes) which eventually depleted.
DA - 2019-04
DB - ResearchSpace
DP - CSIR
KW - Loadshedding
KW - Variable energy contributions
KW - South African power systems
LK - https://researchspace.csir.co.za
PY - 2019
T1 - Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019)
TI - Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019)
UR - http://hdl.handle.net/10204/11017
ER -
|
en_ZA |