Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019)

Show simple item record

dc.contributor.author Wright, Jarrad G
dc.contributor.author Calitz, Joanne R
dc.date.accessioned 2019-04-12T07:58:35Z
dc.date.available 2019-04-12T07:58:35Z
dc.date.issued 2019-04
dc.identifier.citation Wright, J.G, and Calitz, J.R. 2019. Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019). A presentation delivered by the CSIR Energy Centre, 9 April 2019 en_US
dc.identifier.uri http://hdl.handle.net/10204/10959
dc.description Presentation delivered by the CSIR Energy Centre during April 2019. en_US
dc.description.abstract The RSA power system again became constrained in Q1-2019 with Eskom needing to loadshed (to Stage 4 at times). Causes of leadshedding have been cited as high unplanned plant failures on the thermal coal fleet, depleted diesel (OCGTs) and water (pumped storage) combined with the loss of Cahora Bassa import from Mozambique. This has been the most intensive loadshedding experienced in RSA with 595 GWh of load shed just in March 2019 of the total 769 GWh in Q1-2019 (there was 1325 GWh of loadshedding throughout 2015). en_US
dc.language.iso en en_US
dc.publisher CSIR en_US
dc.subject Renewable energy en_US
dc.subject Loadshedding en_US
dc.title Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019) en_US
dc.type Conference Presentation en_US
dc.identifier.apacitation Wright, J. G., & Calitz, J. R. (2019). Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019). CSIR. http://hdl.handle.net/10204/10959 en_ZA
dc.identifier.chicagocitation Wright, Jarrad G, and Joanne R Calitz. "Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019)." (2019): http://hdl.handle.net/10204/10959 en_ZA
dc.identifier.vancouvercitation Wright JG, Calitz JR, Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019); CSIR; 2019. http://hdl.handle.net/10204/10959 . en_ZA
dc.identifier.ris TY - Conference Presentation AU - Wright, Jarrad G AU - Calitz, Joanne R AB - The RSA power system again became constrained in Q1-2019 with Eskom needing to loadshed (to Stage 4 at times). Causes of leadshedding have been cited as high unplanned plant failures on the thermal coal fleet, depleted diesel (OCGTs) and water (pumped storage) combined with the loss of Cahora Bassa import from Mozambique. This has been the most intensive loadshedding experienced in RSA with 595 GWh of load shed just in March 2019 of the total 769 GWh in Q1-2019 (there was 1325 GWh of loadshedding throughout 2015). DA - 2019-04 DB - ResearchSpace DP - CSIR KW - Renewable energy KW - Loadshedding LK - https://researchspace.csir.co.za PY - 2019 T1 - Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019) TI - Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019) UR - http://hdl.handle.net/10204/10959 ER - en_ZA


Files in this item

This item appears in the following Collection(s)

Show simple item record